SB9 Minimum Lot Size and the 40/60 Rule

    By SB9 Partners · Published

    Two numbers show up in almost every SB9 conversation: 1,200 square feet, and 40 percent. They come from the same statute, and they work together. The first is a floor under each new parcel. The second is a fairness rule that keeps one parcel from being a thin leftover. Neither number, by itself, tells you whether a new home will actually fit, or whether a partnership is worth doing. This guide explains the state rule, shows how to apply it to a real lot, and explains why our partnership still looks for generally 10,000+ sq ft of land.

    What state law requires

    Government Code § 66411.7 is the urban lot-split section of SB9. It requires a local agency to ministerially approve a parcel map that divides one eligible single-family lot into two, only if the map meets the statute's conditions. Two of those conditions are about size:

    • Each of the two new parcels must be at least 1,200 square feet.
    • The two parcels must be of approximately equal size, and neither may be smaller than 40 percent of the original lot's area.

    The HCD SB 9 Fact Sheet (September 2024) and HCD's April 2026 duplexes and lot splits fact sheet repeat those minimums. HCD also states that local objective standards cannot preclude the creation of two 1,200 square-foot lots, just as they cannot preclude two units of at least 800 square feet on a qualifying lot.

    The 40/60 rule in plain language

    If you start with one lot and cut it into two, the smaller piece must be at least 40 percent of the original area. The larger piece can be no more than 60 percent. A perfectly even split is 50/50, which also satisfies the rule. A 70/30 split does not, even if both pieces are larger than 1,200 square feet.

    That is why people call it the 40/60 rule, or sometimes the 60/40 rule. The two names describe the same limit. Cities use both. The County of San Diego's SB-9 checklist (PDS-600) describes it as a “60/40 or 50/50 split.” Palo Alto Municipal Code § 21.10.040 says the lots must be of approximately equal area, such that no resulting parcel is smaller than 40 percent of the original. Thousand Oaks Municipal Code § 9-4.3706 uses the same 1,200 square-foot floor and 40 percent test.

    A few examples, using only the state math

    • A 2,400 sq ft lot. This is the smallest original lot that can produce two 1,200 sq ft parcels. A 50/50 split works. A 60/40 split would make the smaller parcel 960 sq ft, which fails the 1,200 sq ft minimum. Lots this small are rarely practical for a new detached home, even if they are legally eligible under the size rule alone.
    • A 6,000 sq ft lot. The smaller parcel must be at least 2,400 sq ft (40 percent), and both must be at least 1,200 sq ft. A 60/40 split would be 3,600 and 2,400. A 50/50 split would be 3,000 and 3,000. Both are legal under the size rule if the other SB9 tests are also met.
    • A 10,000 sq ft lot. The smaller parcel must be at least 4,000 sq ft. A 60/40 split is 6,000 and 4,000. A 50/50 split is 5,000 and 5,000. This is the general minimum we look for in a partnership, not because the statute requires it, but because it is closer to the amount of land needed to build and sell a new home while leaving your existing house on its own parcel.
    • A 20,000 sq ft lot. The smaller parcel must be at least 8,000 sq ft. There is more room to keep the existing house comfortable on one parcel and still leave a buildable second lot, provided the usable, level area and the street access are there.

    These examples use the lot's total area. What matters on the ground is the usable, generally flat portion that can actually hold a house, a setback, and a path to the street. A 15,000 sq ft canyon lot can fail in practice if most of that area is slope, easement or unbuildable setback, even though the 40/60 math looks fine on paper.

    The existing house has to land entirely on one parcel

    The size rule is not the only line that matters. The split line cannot cut through your house. Cities say this in their own words. Palo Alto's code, for example, says that where existing dwellings will remain, no lot line may bisect a structure or leave more than two dwelling units on a resulting parcel. Encinitas and other cities we cover say the existing home must sit entirely on one of the new parcels. In a partnership, that is also the point: you keep your house on one lot, and the unused land becomes the second lot.

    That requirement can force a split that is less even than a drawing on a napkin. If your house and its required yards already occupy 55 percent of a deep lot, the remaining yard may still work as a 45 percent parcel. If the house sits in the middle, or the only leftover land is a long, narrow side yard, the 40 percent test and the “don't cut through the house” test can fail together. A surveyor, not a tape measure in the backyard, is what settles this.

    Access is part of making a legal parcel usable

    A parcel that meets the size rule still needs a way to reach a public street and to receive utilities. HCD's April 2026 fact sheet says local agencies may require easements for public services and utilities, and requirements needed to ensure the parcel has access to or adjoins a public right-of-way, so long as those requirements do not physically preclude the lot split. Agencies may not require dedications of rights-of-way or the construction of offsite improvements as a condition of the split. In practice, the cleanest lots are corner lots, lots with an alley, or deep lots wide enough for a driveway or a recorded access easement along one side.

    Why our partnership looks for 10,000+ square feet

    The state's 1,200 sq ft minimum is a legal floor, not a building plan. An 800 sq ft home, which is the size cities must allow under SB9, can theoretically sit on a very small parcel. Our partnership is designed around building and selling a new home or duplex that fits the neighborhood, while you stay in your house. For that, we generally look for owner-occupied, generally flat lots of 10,000+ sq ft, with an existing home generally worth $1,000,000 or more, and a realistic access path for the new parcel.

    That 10,000+ figure is our criterion, not a change to state law. A smaller lot can still be legally eligible for an SB9 split under the 1,200 sq ft and 40/60 rules. It may or may not be a fit for this partnership. If you are close to the line, or if a large share of the lot is unusable, schedule a free consultation and we will look at the usable area, not just the assessor's square footage. If you don't see your county in our service area, you can still submit your lot and we'll review it.

    Other eligibility rules still apply

    Passing the size test does not make a lot eligible by itself. The parcel still has to be in a single-family zone, in an urbanized area or urban cluster, and clear of the statute's site exclusions and anti-displacement rules. It cannot already have been split under SB9, and the applicant has to be able to sign the three-year owner-occupancy affidavit. Those items are covered in SB9 Lot Split Requirements: Can I Split My Lot? (Eligibility Checklist). Size is usually the easy number to check first; it is rarely the only number that matters.

    How to measure your own lot

    1. Get the lot area from your county assessor or from a recent survey. Do not rely on a listing remark if you can help it.
    2. Multiply that area by 0.40. That is the smallest legal size for either new parcel under the 40/60 rule. Then confirm that this number is at least 1,200 sq ft, which it will be for any original lot of 3,000 sq ft or more.
    3. Sketch your house, driveway, and the level parts of the yard. The second parcel has to be a coherent piece of land, not a leftover sliver behind a retaining wall.
    4. Ask whether that second piece can reach the street without cutting off your own access.
    5. Check the local rulebook. City pages such as Palo Alto, Thousand Oaks, Newport Beach and Rancho Santa Fe, and our county pages for San Diego, Orange, Los Angeles, Santa Clara, San Mateo, Santa Barbara and Ventura, are the place to start.

    What the size rule means for your payout

    In our partnership, your payout has two parts: a fixed amount based on the size of the new lot, plus a share of the profit based on what the new home or duplex sells for. Final terms are set in a written partnership agreement. Because part of the payout is tied to the size of the new lot, the way the line is drawn is not just a planning exercise. A 60/40 split and a 50/50 split can both be legal and still produce different new-lot sizes, different home designs and different sale results. We work through that on the actual survey, not on a generic percentage.

    Next steps

    If you already know your lot size and want to know whether a legal split would also be a practical one, schedule a free consultation. We'll apply the 1,200 sq ft and 40/60 tests to your parcel, look at the usable yard and access, and tell you whether it fits our partnership. For the rest of the legal checklist, use the eligibility guide. For how long the process takes, see the timeline and steps.

    This article is general information, not legal, survey or appraisal advice. The 1,200 sq ft minimum and the 40 percent rule are set by state law; your city may have additional objective standards, which cannot preclude two 1,200 sq ft lots. Confirm the measurements and the current rules with a licensed surveyor and with your local agency before you apply or sign an agreement.

    Frequently asked questions

    What does the 40/60 rule mean?

    The smaller new parcel must be at least 40 percent of the original lot, and both must be at least 1,200 sq ft. A 50/50 split also qualifies under the size rule; a 70/30 split does not.

    How does the rule work on a 10,000 sq ft lot?

    The smaller parcel must be at least 4,000 sq ft. A 60/40 split produces 6,000 and 4,000 sq ft parcels; a 50/50 split produces two 5,000 sq ft parcels. Other eligibility rules still apply.

    Is 10,000 sq ft a state-law minimum?

    No. It is our general partnership criterion. Smaller lots may meet the state size tests, but usable terrain, the existing house, access and other eligibility requirements still determine whether a split is practical.

    This article is general information, not legal, tax or lending advice. Rules change and vary by city; confirm details with the city, your lender, a CPA and a real estate attorney before deciding.