How SB9 lot splits work in Los Angeles County
Under SB9, a lot in a single-family zone can be split into two parcels, with up to two homes on each, through a ministerial approval with no public hearing. In our partnership, your existing home stays on its own parcel. We take on the design, permits, financing and construction of a new home or duplex on the new parcel, then sell it, and you receive your share of the proceeds. You keep living in your house the whole time.
In unincorporated areas, LA County Planning has published guidance on how it applies SB9 and the SB 450 amendments. SB 450 includes the rule that a complete application must be approved or denied within 60 days. Inside cities, the city's planning and building departments decide, using their own objective standards.
Local rules and checks in Los Angeles County
- Charter-city litigation. Redondo Beach, Carson, Torrance and Whittier, later joined by Del Mar, sued the State in City of Redondo Beach v. Bonta, arguing SB9 doesn't apply to charter cities. The trial court agreed in 2024. On November 12, 2025, the Court of Appeal reversed and sent the case back for reconsideration under SB 450. If your property is in one of those cities, we confirm the current position with the city before doing any work.
- Fire hazard zones. SB9 excludes parcels in Very High Fire Hazard Severity Zones unless the project meets fire-safe building standards. Much of LA County's foothill and canyon land is mapped, so we check the current CAL FIRE map for your parcel.
- Hillside and slope. Even outside fire zones, steep lots raise grading, retaining-wall and access costs. That's one reason our partnership focuses on generally flat lots.
- Coastal Zone. Beach cities and parts of the City of LA include land in the state Coastal Zone, where coastal review can be required in addition to the SB9 approval.
- Historic districts and tenants. SB9 doesn't apply to properties in historic districts or designated landmarks, and it can't be used if the project would demolish or alter rent-controlled housing or a home a tenant has occupied in the last three years.
Which Los Angeles County lots qualify for our partnership
Our criteria go further than the state minimums. Lots generally need to be 10,000+ sq ft, generally flat and owner-occupied, with a home generally worth $1,000,000 or more. Wide, deep lots in established neighborhoods, with an unused rear yard and a way to reach the street, are the strongest candidates. Each new parcel must be at least 1,200 sq ft and no smaller than 40% of the original lot, and a lot created by an SB9 split can't be split again.
A realistic timeline
We plan for about 12 months from start to payout: split approval, design and building permits, construction, and sale. In LA County the most common reasons for delay are utility capacity and undergrounding, fire-department access review, coastal review, and permit-counter volume. Sometimes timelines go past 12 months due to unforeseen delays with city approval and construction.
Local project example
We list projects only after they're complete and verified. When we finish a Los Angeles County partnership, its city, lot size, permit number and results will appear here.
Next step for Los Angeles County homeowners
Learn how the homeowner partnership works, read how to evaluate an SB9 partnership offer, then schedule a free consultation so we can confirm which agency approves your lot.