How SB9 lot splits work in San Mateo County
SB9 requires cities and the County to approve qualifying lot splits and two-unit projects ministerially, using objective standards, with no hearing and no CEQA review. Local standards can't physically prevent two homes of at least 800 sq ft on each new lot, and new homes can't be required to sit more than four feet from side and rear lot lines. Under SB 450, in effect since January 1, 2025, a complete application must be decided within 60 days.
Our partnership is built around you staying put. Your house stays on its own parcel. We fund and manage the split, design, permits and construction of a new home or duplex on the new parcel, sell it, and pay your share at the sale.
Local rules and checks in San Mateo County
- City-specific objective standards. Towns with very large lots and cities with smaller ones often set different height, floor-area and design standards for SB9 homes. We work from the current ordinance for your address.
- Coastside coastal review. Parcels in the Coastal Zone can require a coastal permit in addition to the SB9 approval. That affects both the timeline and the design.
- Utilities and access. Older streets can mean sewer laterals, water service and electrical capacity need upgrading for a new home. Narrow or private roads can also complicate fire access and driveways. We price these in before we commit.
- Site exclusions. SB9 doesn't apply on parcels with wetlands, floodways, earthquake fault zones (unless built to seismic standards), Very High Fire Hazard Severity Zones (unless built to fire-safe standards), or historic designations. Hillside parcels on the ridge are where these come up most.
- Owner occupancy. The applying owner signs an affidavit saying they intend to live in one of the homes for at least three years. Our affidavit guide explains what that means in practice.
Questions San Mateo County homeowners often ask
My lot is large but narrow. Can it still split? Possibly. The law requires each parcel to be at least 1,200 sq ft and no smaller than 40% of the original, and each home needs access to the street. Narrow lots can sometimes split front-to-back with a recorded access easement, but the driveway has to work for fire access and your city's objective standards.
Do I need to be on the Coastside to need a coastal permit? Only parcels inside the Coastal Zone need coastal review. Most bayside neighborhoods aren't in it, but we confirm for every address.
Which San Mateo County lots qualify for our partnership
We focus on owner-occupied, generally flat lots that are generally 10,000+ sq ft, with a home generally worth $1,000,000 or more. Wide, deep parcels in established bayside neighborhoods are the most common fit. Each new parcel must be at least 1,200 sq ft and no smaller than 40% of the original lot, and it needs legal access to the street, either directly or through a recorded easement.
A realistic timeline
We plan for about 12 months from start to payout. Coastal review on the Coastside, utility upgrades and construction logistics on tight streets are the most likely reasons for a longer schedule. Sometimes timelines go past 12 months due to unforeseen delays with city approval and construction.
Local project example
We share projects only after they're complete and verified. When we finish a San Mateo County partnership, its city, lot size, permit number and results will be posted here.
Next step for San Mateo County homeowners
Read how the homeowner partnership works and what to ask your lender about a lot split, then schedule a free consultation.