How an SB9 lot split works in San Diego County
California's SB9 lets the owner of a lot in a single-family zone split it into two parcels and build up to two homes on each, with ministerial approval. Ministerial means city staff check the application against written, objective standards. There is no public hearing and no discretionary vote. In our partnership you keep your existing house on one parcel. We design, permit, fund and build a new home or duplex on the other parcel and sell it, and you receive your share of the proceeds when it sells.
Inside the City of San Diego, Information Bulletin 409 says an urban lot split is processed as a Process One (ministerial) Parcel Map. The City recommends applying for the lot split and the new homes at the same time, because doing them in sequence can change what you are allowed to build later. Since January 1, 2025, SB 450 has required local agencies to approve or deny a complete SB9 application within 60 days.
City of San Diego rules we plan around
- Information Bulletin 409. SB9 projects are allowed in the RS, RE, RX and RT zones, and in Planned District zones that allow single-dwelling but not multiple-dwelling development. You can look up your zone in the City's ZAPP map.
- Owner-occupancy affidavit, Form DS-3062. Before the parcel map records, the record owner signs an affidavit stating they intend to live in one of the homes as their primary residence for at least three years from approval. The City signs it and it is recorded with the County Recorder. Form DS-3063, an eligibility declaration, is also required.
- No ADUs on lot-split SB9 projects. IB 409 says that when a project uses the urban lot split provisions together with SB9 units, no ADUs or junior ADUs are permitted. An existing ADU must be removed or converted into one of the SB9 units, and the two lots together can never hold more than four homes.
- Coastal Development Permit in the Coastal Overlay Zone. A Coastal Development Permit is required for every SB9 unit or lot-split application inside the Coastal Overlay Zone. This is the main reason coastal projects take longer.
- Minimum parcel size and rentals. Each new lot must be at least 1,200 sq ft. Homes created through an urban lot split cannot be rented for fewer than 31 days.
- Site exclusions. Parcels in or containing wetlands, a regulatory floodway, the Multi-Habitat Planning Area, conserved environmentally sensitive lands, or a Very High Fire Hazard Severity Zone (unless the building meets Chapter 7A of the Building Code) are among those that are not eligible.
North County cities and the rest of the county
Encinitas, Carlsbad, Poway, Solana Beach and Coronado each publish their own SB9 materials, and we cover them on separate pages: Encinitas, Carlsbad, Poway, Solana Beach and Coronado. For City of San Diego neighborhoods, see La Jolla, Point Loma and Carmel Valley. Every one of these cities works within the same state minimums. Each new parcel must be at least 1,200 sq ft, the two parcels must be roughly equal (neither smaller than 40% of the original lot), and a lot created by an SB9 split can never be split again.
Which San Diego County lots qualify for our partnership
State law sets the legal minimum, but our partnership has its own, stricter criteria so the new home is worth building. Lots generally need to be 10,000+ sq ft and generally flat. The existing home must be owner-occupied and generally worth $1,000,000 or more. The best candidates have an unused side or rear yard and a realistic way to give the new parcel access to the street. That could be a corner lot, an alley, or a yard wide enough for a driveway. Older neighborhoods built on deep parcels and inland estate areas often fit this profile. Steep canyon-edge lots often don't.
A realistic timeline
We plan for about 12 months from start to payout. Roughly the first two months go to the survey, parcel map and split approval. The next two go to design and building permits, then about seven months to construction, and the final month to the sale and payout. A Coastal Development Permit, utility work or a busy permit counter can push a project past 12 months. Sometimes timelines go past 12 months due to unforeseen delays with city approval and construction.
Local project example
We publish project examples only after a project is complete and verified. When we finish a San Diego County project, its city, lot size, permit number and results will appear on this page.
Find out whether your San Diego County lot qualifies
Read how the partnership works, check the FAQ, or go straight to scheduling a free consultation. We'll tell you which rulebook applies to your address and whether the numbers work.