How SB9 lot splits work in Ventura County
SB9 lets a single-family lot be split into two parcels, with up to two homes on each, through a ministerial approval. Staff check the application against objective standards, with no hearing. A city can apply its own objective rules, but they can't physically prevent two homes of at least 800 sq ft on each lot. Side and rear setbacks for new homes are capped at four feet. Since January 1, 2025, SB 450 has required a decision within 60 days of a complete application.
With our partnership, your home stays on its own parcel. We fund and manage the split, design, permits and construction of a new home or duplex on the new parcel, then sell it and pay your share at the sale.
Local rules and checks in Ventura County
- City or County? Each of the 10 cities applies SB9 through its own code. Addresses in unincorporated areas, such as Oak Park, go through County planning. We confirm the agency and pull its current SB9 checklist.
- Coastal Zone. Parts of Ventura, Oxnard, Port Hueneme and the unincorporated coast are in the state Coastal Zone, where a coastal permit may be needed in addition to the SB9 approval.
- Farmland exclusion. SB9 doesn't apply to prime farmland or farmland of statewide importance. That rarely affects suburban tract lots, but it matters at the edges of the county's agricultural areas.
- Fire and hillside limits. Parcels in Very High Fire Hazard Severity Zones are excluded unless the project meets fire-safe building standards. Hillside neighborhoods near the Santa Monica Mountains and other ridgelines need a careful map check.
- Owner occupancy. The owner who applies for the split signs an affidavit saying they intend to live in one of the homes as their principal residence for at least three years. Read our affidavit guide.
Questions Ventura County homeowners often ask
I'm in Oak Park. Does Thousand Oaks approve my split? No. Oak Park is unincorporated, so County planning applies SB9 there, even though the area borders Thousand Oaks.
My yard backs onto open space. Is that a problem? It can be. Conservation easements, habitat areas and fire hazard zones can exclude a parcel or shrink the buildable area, so we check recorded easements and the current maps first.
Which Ventura County lots qualify for our partnership
We look for owner-occupied, generally flat lots that are generally 10,000+ sq ft, with a home generally worth $1,000,000 or more. Deep rear yards in mature subdivisions are the classic fit, especially where a side yard, corner or alley gives the new parcel its own access. Each new parcel must be at least 1,200 sq ft and no smaller than 40% of the original lot.
A realistic timeline
We plan for about 12 months from start to payout: split approval, design and permits, construction, and sale. Coastal review and utility upgrades are the most common reasons for delay in Ventura County. Sometimes timelines go past 12 months due to unforeseen delays with city approval and construction.
Local project example
We publish projects only after they're complete and verified. When we finish a Ventura County partnership, its city, lot size, permit number and results will appear here.
Next step for Ventura County homeowners
Read how the homeowner partnership works and the tax questions to ask your CPA, then schedule a free consultation.