How SB9 lot splits work in Palo Alto
Chapter 21.10 applies only to lots in the R-1 district, including R-1 subdistricts, or the R-E zone. An application is not available on a parcel created by a prior urban lot split, on a parcel adjacent to a lot that the same owner (or a person acting in concert with the owner) already split under this chapter, or on a site that falls within the statute's exclusions — for example wetlands, a very high fire severity zone unless certain mitigation measures have been adopted, special flood hazard areas or regulatory floodways unless federal requirements are met, historic resources, recently tenant-occupied housing, or a parcel withdrawn from the rental market under the Ellis Act in the past 15 years.
The director of planning reviews a qualifying parcel map ministerially and must approve or deny a complete application within 60 days; if the City has not acted in that time, the application is deemed approved. If the application is denied, the director must, within those 60 days, give the applicant a written list of deficiencies and how to remedy them. The code also provides that notice of a pending application be posted at the site and mailed to owners and residents of property within 600 feet. That notice does not turn the review into a public hearing. In our partnership you keep your house on one parcel. We design, permit, fund and build a new home or duplex on the second parcel, sell it, and pay your share at the sale.
Palo Alto rules we plan around
- 1,200 sq ft and the 40 percent rule. Each new parcel must be at least 1,200 sq ft, and no resulting parcel may be smaller than 40 percent of the original lot.
- The existing house stays on one lot. Where existing dwellings will remain, the new lot line may not bisect a structure or leave more than two dwelling units on any resulting parcel.
- The owner's affidavit. The application must include an affidavit, signed under penalty of perjury, that the split would not demolish or alter protected housing, that the parcel is not otherwise ineligible, that the owner intends to occupy one of the units as their principal residence for at least three years from the date the parcel map records, that any rental will be for a term longer than 30 consecutive days, and that the resulting lots will be used for residential purposes only.
- Declarations on the map itself. The face of the parcel map must declare that each lot will be used solely for residential dwellings, that no more than two dwelling units may be permitted on each lot, that rentals must be longer than 30 consecutive days, and that a lot created under this chapter shall not be further subdivided.
- Shared-maintenance and utility documents. Utility easements must be shown on the map. A stormwater-maintenance covenant, and a maintenance agreement for any shared access easements, stormwater treatment, landscaping and private utilities, must be recorded before or at the same time as the final parcel map.
- Two-unit standards and City forms. Construction of two units on an R-1 or R-E lot is also governed by § 18.42.180. The City publishes current SB 9 checklists, an affidavit form and a preliminary planning process on its Forms & Applications page. We use the versions in effect when we apply, not older PDFs.
Which Palo Alto lots qualify for our partnership
Legal eligibility under Chapter 21.10 is only the first filter. We look for owner-occupied, generally flat lots, generally 10,000+ sq ft, with a home generally worth $1,000,000 or more, and a realistic way to give the new parcel street access. The usable, level yard matters more than the lot's total square footage. Historic designations, flood zones and foothill fire maps are among the items we check against the code before anyone spends money on design.
A realistic timeline
We plan for about 12 months from start to payout. Palo Alto's 60-day decision period applies to a complete urban lot-split application. Survey work, recorded maintenance agreements, building permits, utility coordination and construction sit outside that window. Sometimes timelines go past 12 months due to unforeseen delays with city approval and construction.
Local project example
We share only completed, verified projects. When we finish a Palo Alto partnership, its lot size, permit number and results will be listed here.
Next step
Read the Santa Clara County SB9 guide, the eligibility checklist, and schedule a free consultation. We'll confirm whether your lot is in R-1 or R-E and whether a split is realistic.
Frequently asked questions
Which Palo Alto zones qualify under Chapter 21.10?
The chapter applies to R-1 lots, including R-1 subdistricts, and R-E lots. Prior SB9 splits, certain adjacent-owner splits and statutory exclusions can make an application unavailable.
Does mailed notice create a public hearing?
No. The code provides for posting notice and mailing it to owners and residents within 600 feet, but qualifying parcel-map review remains ministerial.
What shared-maintenance documents may be required?
Utility easements must be on the map. A stormwater-maintenance covenant and maintenance agreements for shared access, stormwater treatment, landscaping and private utilities must be recorded before or with the final parcel map.